2nd Floor - Laundry Room
Standard model of Whirlpool included in purchase price
Views from Harrison Ridge
Overlooking the Harrison River and Mountains and surrounded by nature.
2nd Floor Construction - Building 1
Interior of the 2nd Floor Bedroom and Hallway for Phase 2
1st Floor - Builidng 7 Stairs
Interior of Stairs and Railings for Phase 1
2nd Floor - Building 7 Bedroom
Interior of Bedoom with Vaulted Ceilings for Phase 1
1st Floor - Building 7 Kitchen
Interior of Kitchen and Living Room for Phase 1
2nd Floor - Building 7 Master Washroom
Interior of Master Washroom for Phase 1
1st Floor - Building 7 Living Room
Interior of the Living Room for Phase 1
Building 7 - DEC 2021
Exterior of house almost completed. Garage will be installed soon. Est. completion: End of Jan 2022
Building 2 - NOV 2021
Poured concrete for first floor. Framing starts in 2-3 weeks time.
Building 7 - NOV 2021
Almost done with Units 1-4.
Ready for installation and exterior finishing. All framing and electrical completed.
Building 1 - NOV 2021
Unit #61-64 Finishing up 2nd floor framing overall framing to be completed soon.
Digging the Walkway - OCT 2021
Construction team making the walkway to access the townhome to the street though a small staircase.
Asphalt Completed - OCT 2021
An even and clean layer of Asphalt has been laid out on the roads of Harrison Ridge.
Building 1 - SEPT 2021
Filling our foundation with concrete for safe and sturdy homes.
Building of Phase 1 - SEPT 2021
Installed the roofs and windows of Building 7 also started foundation of Building 1
Harrison Ridge Playground - SEPT 2021
Our playground is now installed at Harrison Ridge. Get excited for a fun time playing with your family and children.
Building 7 - SEPT 2021
Completed construction of Building 7. Roof will be installed in 2 weeks
Building 1 Concrete Pour - SEPT 2021
Laying out the foundations of Building 1 and pouring the concrete to build stable long lasting homes.
Building 7 - SEPT 2021
Our hardworking construction team has completed the roof of Building 7. (Units 1-4)
Harrison Ridge Playground - SEPT 2021
Our playground is now installed at Harrison Ridge. Get excited for a fun time playing with your family and children.